ARTICLE 275

2009-10   2010-11

List of works executed  out of Article- 275(1)-2009-10
Sl
No
C. R No.  Name of the Project Block Amount
sanctioned
Expenditure
incurred
Balance Status of
the work
1 22F2/06-07 Completion of 60 seated Boys Hostel Building at Govt. High School Chitrakonda  Korukonda 5.00 5.00 0.00 comp.
2 21F2/06-07 Completion of 60 seated Boys Hostel Building at Govt. High School in SVB High School MV-79  Podia 5.00 5.00 0.00 comp.
3 17F2/06-07 Completion of Hostel for upgraded Girls Pry. Sch. at Dharampalli Podia 7.18 7.18 0.00 comp.
4 24F2/06-07 Completion of Hostel for upgraded Girls Pry. Sch. at Sorisomala  Malkangiri 7.30 7.30 0.00 comp.
5 25F2/06-07 Completion of Hostel for upgraded Girls Pry. Sch. at Rasabeda Khairput 7.47 7.47 0.00 comp.
6 31F2/06-07 Completion of Hostel for upgraded Girls Pry. Sch. at Kadamguda Khairput 7.47 7.47 0.00 comp.
7 19F2/06-07 Completion of Hostel for upgraded Girls Pry. Sch. at Potrel  Korukonda 7.34 7.34 0.00 comp.
8 33F2/06-07 Completion of Hostel for upgraded Girls Pry. Sch. at Mahupadar Mathili 7.62 7.62 0.00 comp.
9 20F2/06-07 Completion of Hostel for upgraded Girls Pry. Sch. at Kalimela  Kalimela 7.22 7.22 0.00 comp.
10 47/ 06-07 Completion of Hostel for upgraded Girls Pry. Sch. at Rajgiri  Kalimela 1.68 1.68 0.00 comp.
11 22/09-10 Completion of Hostel Bld. for ST/SC Boys at SVB H/S, MV-79  Podia 0.48 0.48 0.00 comp.
12 36/ 09-10 Const. of Toilet complex at Satiguda GH/S- I Malkangiri 3.50 3.50 0.00 comp.
13 37/ 09-10 Con. of Toilet complex at Satiguda GH/S- II Malkangiri 3.50 1.54 1.96 in prog.
14 38/ 09-10 Const. of Toilet Complex at Pandripani S/S Malkangiri 3.50 3.50 0.00 comp.
15 39/ 09-10 Const.of Toilet Complex at Serpalli PSH Malkangiri 3.50 2.95 0.55 in prog.
16 40/ 09-10 Const.of Toilet Complex at Podia H/S Podia 3.50 3.50 0.00 comp.
17 41/ 09-10 Const. of Toilet Complex at MV-79 Res. GH/S- I Podia 3.50 3.50 0.00 comp.
18 42/ 09-10 Const. of Toilet Complex at MV-79 Res. GH/S - I Podia 3.50 3.50 0.00 comp.
19 43/ 09-10 Const. of Toilet Complex at Sindhrimala Upg. Sch. (Kasturaba Balika Vidyalaya ) Malkangiri 2.00 1.90 0.10 comp.
20 46/ 09-10 Const. of Toilet Complex at Kutbanpalli PSH Korukonda 3.50 2.78 0.72 in prog.
21 47/ 09-10 Const. of Toilet Complex at MV-72 PSH Kalimela 3.50 3.50 0.00 comp.
22 48/ 09-10 Const. of Toilet Complex at Pulimetla PSH   3.50 3.15 0.35 in prog.
23 49/ 09-10 Toilet Complex at Kalimela P.U.P. School Kalimela 3.50 3.37 0.13 comp.
24 50/ 09-10 Toilet Complex at Kalimela Girls H/S Kalimela 3.50 2.76 0.74 in prog.
25 51/ 09-10 Toilet Complex at Chitrakonda Res. GH/S - I  Korukonda 3.50 3.04 0.46 in prog.
26 52/ 09-10 Toilet Complex at Chitrakonda Res. GH/S - II Korukonda 3.50 3.07 0.43 in prog.
27 53/ 09-10 Cons. of Toilet Complex at Parkanmala S/S. K.Gumma 3.50 3.30 0.20 comp.
28 54/ 09-10 Cons. of Toilet Complex at  Khemaguru S/S. Khairput 3.50 3.07 0.43 in prog.
29 22/09-10 Completion of Hostel Bld. for ST/SC Boys at SVB H/S, MV-79  Podia 2.12 2.12 0.00 comp.
    TOTAL   123.87 117.81 6.06  

 

List of works executed  out of Article- 275(1)-2010-11
Sl
No
C. R No.  Name of the Project Amount
sanctioned
Expenditure
incurred
Balance Remarks
1 2 3 4 5   6
1 55/ 09-10 Cons. of Toilet Complex at Govindapalli H/S. 3.50 3.50 0.00 Comp.
2 56/ 09-10 Toilet Complex at  Mathili Res. Girls H/S. 3.50 3.16 0.34 In Prog.
3 57/ 09-10 Cons. of Toilet Complex at  Udulibeda PSH 3.50 2.09 1.41 In Prog.
4   Funds of Rs. 11,63,078/- placed with E.E, GED, Sunabeda for Elect. installation to K.Gumma GH/S & Mahupadar H/S.  11.64 0.00 11.64 In Prog.
5 71/ 09-10 Completion of Dharampalli S/S 2.50 2.50 0.00 Comp.
6 72/ 09-10 Comp. of Hostel Bld. at Satiguda Girls H/S. 5.00 5.00 0.00 Comp.
7 73/ 09-10 Comp. of Pedakonda Girls Hostel. 4.00 4.00 0.00 Comp.
8 74/ 09-10 Comp. of Girls Hostel bld. at Sorisomala 3.00 3.00 0.00 Comp.
9 75/ 09-10 Comp. of 1st Fl. Bld. of ST Boys H/S at MV-7. 5.00 5.00 0.00 Comp.
10 83/ 09-10 Comp. of Addl. Classroom at Girkanpalli S/S 0.50 0.50 0.00 Comp.
11 84/ 09-10 Comp. of Addl. C.Room at Koimetla P/S 0.50 0.50 0.00 Comp.
12 85/ 09-10 Comp. of Addl. Classroom at Chitrakonda 0.50 0.50 0.00 Comp.
13 86/ 09-10 Comp. of Addl. C.Room at Titiberi Pry. Sch. 0.50 0.50 0.00 Comp.
14 87/ 09-10 Comp. of Addl. Classroom at Badapadar 0.50 0.50 0.00 Comp.
15 91/ 09-10 Comp. of Addl. Classroom at Udulibeda 0.50 0.50 0.00 Comp.
16 92/ 09-10 Comp. of Addl. Classroom at Tigal 0.50 0.50 0.00 Comp.
17 93/ 09-10 Comp. of Addl. Classroom at Kamarguda 0.50 0.50 0.00 Comp.
18 94/ 09-10 Comp. of Addl. Classroom at B.L.Pur 0.50 0.50 0.00 Comp.
19 95/ 09-10 Comp. of Addl. Classroom at Silakota 0.50 0.50 0.00 Comp.
20 96/ 09-10 Comp. of Addl. Classroom at Pedawada 0.50 0.50 0.00 Comp.
21 148/ 09-10 Con. of New PSH Bld. at Mundaguda Pry. 10.00 0.00 10.00 In Prog.
22 5F2/ 09-10 Con. of New PSH Bld. at Gumuka 11.10 4.55 6.55 In Prog.
23 14/ 10-11 Completion of Boys hostel at Govindapalli. 2.50 2.50 0.00 Comp.
24 15/ 10-11 Completion of Boys hostel at Mahupadar 3.00 0.00 3.00 In Prog.
25 16/ 10-11 Const. of Toilet complex at Sadasivpur. 2.00 1.13 0.87 In Prog.
26 14/ 09-10 Const. of Girls Hostel Building at Women's College, Malkangiri (E.C- 24.186 lakh) 8.02 6.75 1.27 In Prog.
27 136/ 10-11 Completion of Incomplete Goraseth Nalla 24.00 22.12 1.88 In Prog.
28 143/ 10-11 Const. of Addl. Classroom & Repair of Kaliaguda SSD H/S (With W/ S ) 3.50 2.04 1.46 In Prog.
29 147/ 10-11 Toilet Complex at 100 seated ST Girls Hostel at Tunnel Camp 2.50 2.11 0.39 In Prog.
30 148/ 10-11 Toilet Complex at 100 seated ST Girls Hostel at Sikhpally A/S. 2.50 0.00 2.50 In Prog.
31 149/ 10-11 Toilet Complex at 100 seated ST Girls Hostel at Temp. Colony 2.50 0.00 2.50 In Prog.
32 150/ 10-11 Toilet Complex at 100 seated ST Girls Hostel at Koimetla Pry. School. 2.50 0.00 2.50 In Prog.
33 151/ 10-11 Toilet Complex at 100 seated ST Girls Hostel at Nalagunthi 2.50 0.00 2.50 In Prog.
34 152/ 10-11 Toilet Complex at 100 seated ST Girls Hostel at S.Tondapally Pry. School 4.50 0.00 4.50 In Prog.
35 153/ 10-11 Completion of Double storied Hostel Bld. near Govt. Science College, Malkangiri 4.50 1.81 2.69 In Prog.
36 22F2/10-11 Const. of Minor Bridge  on the road from Kamalapadar to Dangaskhal 35.00 0.00 35.00 In Prog.
37 23F2/10-11 Const. of RCC culvert from Koyaguda to Teliguda 8.00 0.00 8.00 In Prog.
38 1F2/ 11-12 Construction of Minor Bridge at Mecca to Dalapatiguda  49.77 0.00 49.77 In Prog.
39 Forest Right Act -2006 (10% of Allotment) 25.058 6.35 18.70 In Prog.
  TOTAL 250.58 83.11 167.47